Skip to main content
University of Nebraska–Lincoln
  • Visit
    • Visit the University of Nebraska–Lincoln
  • Apply
    • Apply to the University of Nebraska–Lincoln
  • Give
    • Give to the University of Nebraska–Lincoln
Log In
Search

Search Form

Digital Photo Archive
Search
Log In
  • Photo Search
  • All Tags
  • Multi-Tag Browser
Image
A large crane is being assembled west of Love Library. A summer project will close Love Library Nort
210512_Crane_004
Image
A large crane is being assembled west of Love Library. A summer project will close Love Library Nort
210512_Crane_007
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_108
Image
A Hausmann Construction employee unfurls a flag placed on the final steel beam during the topping ou
210409_CEHS_055
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_086
Image
A crane lifts the final beam into the air as Hausmann Construction workers ready to bolt it into pla
210409_CEHS_117
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_069
Image
Marjorie Kostelnik, professor for Child, Youth, and Family Studies at CEHS, adds her signature to th
210409_CEHS_098
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_073
Image
Steel work on the construction of the new CEHS structure to replace Mabel Lee Hall is almost complet
210311_Mabel_Lee_002
Image
Steel work on the construction of the new CEHS structure to replace Mabel Lee Hall is almost complet
210311_Mabel_Lee_004
Image
Testing pod on 17th Street next to Cather Dining Center. Pods are springing up on campus for the new
210105_Pods_013
Image
Testing pod west of Hamilton Hall. Pods are springing up on campus for the new saliva-based COVID te
210105_Pods_039
Image
Testing pod by Nebraska Union. Pods are springing up on campus for the new saliva-based COVID tests
210105_Pods_018
Image
Testing pod by Nebraska Union. Pods are springing up on campus for the new saliva-based COVID tests
210105_Pods_033
Image
Workers are putting the finishing touches on East Campus’ Dinsdale Family Learning Commons, a new
201208_Dinsdale_Thompson_002
Image
New windows being installed in Canfield Hall. December 7, 2020.
201207_Canfield_017
Image
Steam tunnel work in-between Mueller Bell Tower and Love Library. December 1, 2020.
201201_Mueller_001
Image
Work continues on the construction of the new CEHS structure to replace Mabel Lee Hall. December 1,
201201_Mabel_Lee_002
Image
Workers wire electrical outlets into the Learning Stairs. The tiered area leading to the second floo
201123_Library_042
Image
Regina Flowers points out features during a tour of the remodeled C.Y. Thompson Library on East Camp
201123_Library_131
Image
Looking up through the atrium of the library. Tour of remodeled C.Y. Thompson Library on East Campus
201123_Library_176
Image
Workers wire electrical outlets into the Learning Stairs. The tiered area leading to the second floo
201123_Library_065
Image
The Engler Agribusiness Entrepreneur offices move to the remodeled C.Y. Thompson Library on East Cam
201123_Library_163
Image
The bottom floor of the library. Tour of remodeled C.Y. Thompson library on east campus. November 23
201123_Library_212
Image
Tour of remodeled C.Y. Thompson Library on East Campus. November 23, 2020.
201123_Library_013
Image
Workers wire electrical outlets into the Learning Stairs. The tiered area leading to the second floo
201123_Library_073
Image
Wood wall texture is a part of the remodel in the C.Y. Thompson Library. Tour of remodeled C.Y. Thom
201123_Library_168
Image
To protect COVID-19 testers from the elements this winter, two custom "pods" were built in the Memor
201113_Testing_Pods_028
Image
Chancellor Ronnie Green adds signatures to the last beam before it is placed. Due to COVID-19 precau
200826_Topping Cermony_114
Image
Chancellor Ronnie Green and Dean LancePerez sign the last. Due to COVID-19 precautions, a public cer
200826_Topping Cermony_117
Image
Due to COVID-19 precautions, a public ceremony was not able to be held. Instead, signatures from col
200826_Topping Cermony_125
Image
College of Engineering Dean Lance Perez adds his signature to the last beam before it is placed. Due
200826_Topping Cermony_115
Image
Left to right Joey Hausmann, Lance Perez, Chancellor Ronnie Green and Chad Wiles pose with the worke
200826_Topping Cermony_118
Image
Chancellor Ronnie Green adds signatures to the last beam before it is placed. Due to COVID-19 precau
200826_Topping Cermony_113
Image
College of Engineering Dean Lance Perez adds his signature to the last beam before it is placed. Due
200826_Topping Cermony_116
Image
Due to COVID-19 precautions, a public ceremony was not able to be held. Instead, signatures from col
200826_Topping Cermony_124
Image
Construction of the new hotel at Nebraska Innovation Campus is progressing. August 12, 2020.
200812_NIC_Hotel_023
Image
Construction of the new hotel at Nebraska Innovation Campus is progressing. August 12, 2020.
200812_NIC_Hotel_002
Image
Construction of the new hotel at Nebraska Innovation Campus is progressing. August 12, 2020.
200812_NIC_Hotel_016
Image
Facilities Planning and Construction will soon wrap up the overhaul of a nearly 500-foot steam tunne
200806_Tunnel_008
Image
Facilities Planning and Construction will soon wrap up the overhaul of a nearly 500-foot steam tunne
200806_Tunnel_006
Image
The steel skeleton goes up for the Engineering Phase 1 construction to replace the Link. Work contin
200626_ENG_001
Image
The steel skeleton goes up for the Engineering Phase 1 construction to replace the Link. Work contin
200626_ENG_010
Image
The steel skeleton goes up for the Engineering Phase 1 construction to replace the Link. Work contin
200626_ENG_004
Image
The steel skeleton goes up for the Engineering Phase 1 construction to replace the Link. Work contin
200626_ENG_023
Image
The steel skeleton goes up for the Engineering Phase 1 construction to replace the Link. Work contin
200626_ENG_008
Image
Aerial view of (clockwise) Entomology Hall, Nebraska East Union, Miller Hall, Massengale Residential
200513_Campus_059

Pagination

  1. First page « First
  2. Previous page ‹‹
  3. Page 1
  4. Page 2
  5. Page 3
  6. Current page 4
  7. Page 5
  8. Next page ››
  9. Last page Last »

Campus Links

  • Directory
  • Employment
  • Events
  • Libraries
  • Maps
  • News
  • Office of the Chancellor
  • Report an Incident

Policies & Reports

  • Accessibility Statement
  • Institutional Equity and Compliance
  • Notice of Nondiscrimination
  • Privacy Policy
  • Safety at Nebraska
  • Student Information Disclosures
UNL web framework and quality assurance provided by the Web Developer Network · QA Test
University of Nebraska–Lincoln
Established 1869 · Copyright 2025