Skip to main content
University of Nebraska–Lincoln
  • Visit
    • Visit the University of Nebraska–Lincoln
  • Apply
    • Apply to the University of Nebraska–Lincoln
  • Give
    • Give to the University of Nebraska–Lincoln
Log In
Search

Search Form

Digital Photo Archive
Search
Log In
  • Photo Search
  • All Tags
  • Multi-Tag Browser
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_051
Image
Brent Morgan, Facilities Coordinator for University Libraries climbs up through the hatch into the L
220425_Cupola_121
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_198
Image
Erin Colonna, graphic designer with the University Libraries, documents signatures on the walls insi
220425_Cupola_258
Image
Detail showing chipped paint and water damage to the exterior of the Love Library cupola. The renova
220425_Cupola_009
Image
Detail showing chipped paint and water damage to the exterior of the Love Library cupola. The renova
220425_Cupola_020
Image
Erin Colonna, graphic designer with the University Libraries, documents signatures on the walls insi
220425_Cupola_066
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_147
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_215
Image
Erin Colonna, graphic designer with the University Libraries, climbs down the ladder from the Love L
220425_Cupola_284
Image
Detail showing chipped paint and water damage to the exterior of the Love Library cupola. The renova
220425_Cupola_011
Image
Detail showing chipped paint and water damage to the exterior of the Love Library cupola. The renova
220425_Cupola_026
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_097
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_167
Image
Signatures in the Love Library Cupola. The cupola will be renovated this summer following spring com
220425_Cupola_221
Image
Detail showing chipped paint and water damage to the exterior of the Love Library cupola. The renova
220425_Cupola_005
Image
Construction workers stand on scaffolding near the top of Mueller Tower. The tower is undergoing a r
250623_Mueller_0355
Image
Wide shot of UNL city campus and downtown Lincoln looking south. Construction workers stand on scaff
250623_Mueller_0364
Image
Kehm Construction employees use a power lift to get down from working on Mueller Tower. In front of
250702_Mueller_2111
Image
Issac Lucar, a first-year student from Schuyler studying chemical engineering, removes invasive vine
250821_Service_Project_4033
Image
Dakota Sage, a first-year student from Central City studying veterinary science, and Caroly Gomez, a
250821_Service_Project_4061
Image
Chase Simpson pulls bishop's weed in the upper level of the Sunken Gardens. Simpson is a member of t
250821_Service_Project_4301
Image
Wood pallets are stacked behind a fence around Mueller Tower in preparation of the bell tower's reno
250523_City_Campus_9217
Image
Construction workers stand on scaffolding near the top of Mueller Tower. The tower is undergoing a r
250623_Mueller_0358
Image
Ostin Gustafson (left) and Charles Tucker unhook a bucket filled with exterior stone removed from Mu
250702_Mueller_2063
Image
Lexie Lilienthal, a first-year student from Grand Island studying animal science, removes invasive v
250821_Service_Project_4025
Image
First-year students Glazier Demma, Kevin O'Connor and Winner Mutoke shovel mulch onto landscaping in
250821_Service_Project_4045
Image
Students clean up flower beds at the Sunken Gardens during the Urban Plunge service event.
250821_Service_Project_4063
Image
A student helps Yin Po Po Aung untangle a stick from plants while weeding and cleaning up the Sunken
250821_Service_Project_4308
Image
Construction workers stand on scaffolding near the top of Mueller Tower. The tower is undergoing a r
250623_Mueller_0351
Image
Construction workers stand on scaffolding near the top of Mueller Tower. The tower is undergoing a r
250623_Mueller_0362
Image
Ostin Gustafson guides Charles Tucker, truck lift operator to place a pallet of stone on a flatbed.
250702_Mueller_2098
Image
Students volunteering for the Urban Plunge Service Project pose for a group photo in front of the Li
250821_Service_Project_4027
Image
First-year students Glazier Demma and Winner Mutoke rake mulch onto landscaping in front of the entr
250821_Service_Project_4053
Image
Dakota Sage, a first-year student from Central City studying veterinary science, and Caroly Gomez, a
250821_Service_Project_4298
Image
Ashton Koch, senior from Omaha and the outreach coordinator for the Women’s Center, sorts gifts fo
211209_Little_Huskers_024
Image
Ashton Koch, senior from Omaha and the outreach coordinator for the Women’s Center, sorts gifts fo
211209_Little_Huskers_096
Image
The 8.1-million-gallon thermal energy storage tank northeast of city campus works like a battery, ho
211202_Thermal_Tank_003
Image
The 8.1-million-gallon thermal energy storage tank northeast of city campus works like a battery, ho
211202_Thermal_Tank_004
Image
The 8.1-million-gallon thermal energy storage tank northeast of city campus works like a battery, ho
211202_Thermal_Tank_012
Image
The Columns in front of the east stadium will be taken down and stored this summer to make way for t
210430_Columns_015
Image
A Hausmann Construction employee unfurls a flag placed on the final steel beam during the topping ou
210409_CEHS_055
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_086
Image
A crane lifts the final beam into the air as Hausmann Construction workers ready to bolt it into pla
210409_CEHS_117
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_069
Image
Marjorie Kostelnik, professor for Child, Youth, and Family Studies at CEHS, adds her signature to th
210409_CEHS_098
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_073
Image
Topping out ceremony for the new construction atop the demolished Mabel Lee Hall. April 9, 2021.
210409_CEHS_108

Pagination

  1. First page « First
  2. Previous page ‹‹
  3. Page 1
  4. Page 2
  5. Current page 3
  6. Page 4
  7. Page 5
  8. Next page ››
  9. Last page Last »

Campus Links

  • Directory
  • Employment
  • Events
  • Libraries
  • Maps
  • News
  • Office of the Chancellor
  • Report an Incident

Policies & Reports

  • Accessibility Statement
  • Institutional Equity and Compliance
  • Notice of Nondiscrimination
  • Privacy Policy
  • Safety at Nebraska
  • Student Information Disclosures
UNL web framework and quality assurance provided by the Web Developer Network · QA Test
University of Nebraska–Lincoln
Established 1869 · Copyright 2025